wellness
Cycling routes safe for families and beginners
Townsville families now have access to flat, protected paths along the Strand and Ross River corridors.
How we reported this

Townsville City Council completed marking 12 kilometres of dedicated family cycling paths on 30 June 2026, connecting the Strand Waterpark precinct to the lower reaches of the Ross River.
Winter school holidays and renewed focus on local outdoor activity have driven more parents to seek low-traffic routes that do not require advanced skills or steep climbs such as Castle Hill.
Protected paths through key precincts
The new Strand section runs parallel to the beach strip between the Waterpark and the Rockpool, separated from vehicle lanes by a concrete barrier installed last month. Further inland, the Ross River path starts at the Aplin Weir footbridge and extends 4.8 kilometres upstream through the Riverway precinct, passing the Townsville Hospital grounds where staff often cycle to work. Both routes form part of the council’s Active Transport Program launched in 2025.
Local data released by the council in June shows a 28 percent increase in family cycling event registrations compared with the same period in 2024. A two-hour hire of a standard or child-seat bike from the Strand rental kiosk costs $15, with helmets included.
Practical steps for first rides
Beginners are advised to start at the Strand Waterpark car park on weekends when traffic is lighter and to follow the marked green signs that indicate the 3.2-kilometre loop back to the playground area. Riders heading to the Ross River section can park at the Aplin Weir reserve and use the same app-based map the council updated on 2 July. Parents should check daily wind speeds on the Bureau of Meteorology Townsville station before heading out, particularly on days when northerly breezes exceed 20 kilometres per hour.
The council plans to add lighting along the Ross River stretch by December, allowing safer evening rides during the longer summer days.