Thank you for your patience. Some pages may be slower than usual while we make improvements behind the scenes.

Tuesday 21 July 2026
Beta
The Daily Townsville

Townsville Local News · Every Day

finance

Townsville Entrepreneur Leads Charge on Sustainable Data Infrastructure

A local startup on Flinders Street is positioning Townsville as a hub for energy-efficient computing amid national infrastructure strains.

By Townsville Business Desk · Published 20 July 2026

How we reported this

Produced with AI assistance and reviewed against our editorial standards. Sources are linked where available. Spotted an error or need a correction? Contact [email protected].

Townsville Entrepreneur Leads Charge on Sustainable Data Infrastructure
AI illustration

A Townsville firm called North Queensland Data Ventures has secured a $12 million contract to develop a modular data facility that cuts energy use by 40 percent compared with standard builds, with site preparation set to begin on 20 July along Stanley Street in the CBD.

The move comes as Australia grapples with repeated network failures and rising power demands from artificial-intelligence operations, pushing regional cities to create their own reliable digital backbone rather than rely on distant providers.

Partnerships with local institutions

The project draws on expertise from James Cook University’s engineering faculty and coordinates with Townsville Enterprise on Stanley Street to attract skilled workers from the city’s defence and resources sectors. Early tenants already lined up include a medical-records service based near The Strand and a logistics software company operating out of the Port of Townsville precinct.

Company founder and lead engineer Marcus Reilly, who grew up in the suburb of Hermit Park, said the design incorporates seawater cooling loops drawn from the Ross River dam pipeline, a feature tested in a smaller pilot last year at a warehouse on Ingham Road.

Numbers that matter

Industry modelling released this month by the Australian Data Centre Association estimates that facilities using similar cooling methods can reduce annual water consumption by 2.8 million litres per megawatt of capacity. North Queensland Data Ventures plans to start with 4 megawatts, meaning the Townsville site could save roughly 11 million litres of water each year once fully operational in late 2027.

Construction tenders close on 31 July, and the company will hold an open day on 15 August at its temporary office above the Townsville Bulletin building on Flinders Mall for local trades and suppliers interested in bidding.

Businesses wanting to future-proof their own connectivity can register for a free assessment through Townsville Enterprise before the end of the month.

This article is general information only and is not personal financial or investment advice. Consider your own circumstances and seek licensed professional advice before making financial decisions.

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

The Daily Townsville is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across AUS